KT Cloud and Keppel plan a 110 MW AI data-centre campus in Ansan, South Korea
KT Cloud will partner with Singapore's Keppel on the 60 MW Ansan 2 site, due to start construction in November 2026 and open in 2030 with liquid cooling on every floor, alongside the 50 MW Ansan 1 site now being built.